SIDING ยท BERGEN COUNTY, NJ
Siding Installation & Replacement in Bergen County, NJ
We do new siding installation and full siding replacement, not repairs, for homes across Bergen County, NJ, with the housewrap and flashing behind the siding done as carefully as the boards you see.
- NJ Home Improvement Contractor Registration #13VH11535000, licensed and insured
- 15+ years and 5,000+ projects, serving all of Bergen County
- 5.0 stars from 132 Google reviews
- 20-year workmanship warranty on the siding we install, with normal upkeep
THE WALL
Siding Fails From Behind, Not From the Front
Most siding calls start with something visible. A board that has cupped, a panel that rattles in the wind, paint that will not stay on the north side, a soft spot under a window. The visible part is rarely the problem. Siding is a rain screen. It sheds most of the water that hits the wall, but it was never designed to be watertight. Wind pushes rain through the laps, the joints and the gaps around every window, outlet and hose bib. That is normal. What decides whether the wall stays dry is what sits behind the siding: the housewrap, the flashing and the sheathing it all hangs on.
On a well-built wall, water that gets past the siding lands on a water-resistive barrier, usually a housewrap, and drains down and out. Every layer laps over the one below it, shingle fashion, so gravity does the work. Window and door openings are flashed in order, sill pan first, then the sides, then the head, with the housewrap lapped over the head flashing. A small drainage gap behind the siding lets the wall dry between storms. Built this way, the siding can be any material you like, because the wall has a way to drain and dry.
When a wall was built or re-sided without that layer, or with the laps running the wrong way, water gets behind the cladding and has nowhere to go. It sits against the sheathing. On an older Bergen County house that may be plank sheathing that has been damp for years. Vinyl and fiber cement hide that damage well. The outside looks fine while the sheathing softens and the sill goes. That is why a siding estimate from us starts with the wall and what is going on inside the house, not with a color chart.
THE ROOF EDGE
Where the Roof Meets the Wall, Siding Takes the Blame
A lot of the water damage blamed on siding started where the roof runs into a wall. Every dormer, every setback second story, every porch or garage roof that dies into a sidewall is a joint between two systems. On that joint, each course of shingles gets its own piece of step flashing turned up against the wall, and the housewrap and siding lap over it. At the bottom of the run, where the roof edge meets the gutter, a small bent piece called a kick-out flashing throws the water out into the gutter. Without it, every rain sends a stream down the wall and behind the siding at that corner. It is a common cause of hidden rot, and it is a roofing detail, not a siding detail.
Chimneys are the same story. The counterflashing set into the mortar joints has to lap over the step flashing, and the siding has to stop short of the masonry with a trimmed and flashed gap, not a bead of caulk. Drip edge at the eave has to carry water into the gutter and not behind it. The fascia behind the gutters has to be checked too, which is one reason the existing gutters come down on every re-side we do and are replaced with new gutters once the fascia and siding are finished. Our crews work these joints on every roof replacement and chimney repair we do. When the same people side the wall, the flashing is planned once, from the ridge down, instead of being handed off between two contractors who each assume the other handled it.
That also settles the order of work. If the roof is due in the next few years, it goes on first, so the new step flashing and kick-outs are built into the wall rather than cut in later. If the roof is sound, we tie into the flashing that is there and tell you plainly if any of it needs a roof repair first.
THE MATERIAL
Vinyl, Fiber Cement and Wood, Without the Sales Pitch
Most of the siding we see going onto Bergen County houses today is vinyl, fiber cement or wood. Each has a real case for it and a real cost in time and upkeep. The right material depends on the house, the budget and how much maintenance you want. We install vinyl, fiber cement, wood siding and cedar shakes, and the brands we put up include CertainTeed and James Hardie HardiePlank.
Vinyl is light and simple to live with. It does not need paint, it washes with a hose, and the color runs through the panel so scratches are hard to see. Its weakness is movement. A 12-foot panel can grow and shrink close to half an inch between a January night and a July afternoon, so it has to be hung loose, with room to slide, or it buckles. It can also soften and warp where a neighbor’s low-E window reflects sun onto the wall, a real issue on tight Bergen County lots. Insulated vinyl adds a foam backing that stiffens the panel and evens out an old, wavy wall.
Fiber cement is a board of sand, cement and cellulose fiber. It is heavy, it does not burn, insects ignore it, and it holds a crisp painted look vinyl does not quite match. It takes more labor to install because of the weight and the cutting, its clearances off the roof and the ground have to be kept exactly, and the paint and caulk at the joints need attention over time. Wood, as clapboard or cedar shakes, is what many older Bergen County houses were built with, and it is the right call when the house should keep that look. It takes stain or paint well and cuts and fits easily around old, out-of-square openings, but it is wood, and it asks more of the owner than the other two. Cut ends have to be sealed, the finish cannot be put off, and the boards have to stay clear of the roof, the ground and the mulch or they wick water. Aluminum still turns up on older homes here, and we can talk through replacing it.
THE INSTALL
What a Proper Siding Job Looks Like, and How to Spot a Bad One
Good siding work is mostly invisible once finished, so it helps to know what to watch for while the crew is on the wall. On a tear-off, the old siding comes off and the sheathing gets looked at before anything new goes up. Soft or delaminated sheathing is replaced, not covered. Housewrap, or rigid insulation board with its seams taped, goes on from the bottom up and laps over the step flashing and every head flashing, shingle fashion. Windows and doors get head flashing above the trim so water running down the wall is thrown clear of the frame. J-channel is a trim piece that receives the end of a panel. It is not flashing and should never be asked to do that job.
On vinyl, nails go through the center of the slot and are left about a dime’s thickness proud, so the panel can slide. A finished panel should move a little side to side by hand. Panels stop about a quarter inch short of every corner post and channel, more in cold weather, and the ends are never caulked. Seams in each course are staggered so they do not line up into a ladder. On fiber cement and wood, the boards stop an inch or two above the shingles and well clear of the ground and the deck, every butt joint has a strip of flashing behind it, and cut ends are sealed or primed before paint.
A bad job shows itself fast. Wavy panels mean tight nailing or an uneven wall underneath. On vinyl, face nails through the panel mean someone was in a hurry. Wood or fiber cement siding touching the shingles or sitting in the mulch is wicking water right now. Caulk where a flashing should be is a leak waiting on the next storm. If you can see any of these from the driveway, the parts you cannot see were probably done the same way.
ON THE JOB
On the Job: A Bergen County Re-Side
Four photos from one siding replacement in Bergen County: old wood shingle and aluminum off, insulation board on, new gray vinyl and white trim up.
ON THE JOB ยท NORTHERN NEW JERSEY
GAF Hunter Green Roof, Cedar Shake Siding and AZEK Trim on a Lakeside Home in Northern New Jersey
This lakeside two-story got its whole exterior done in one job. The roof came first: a new GAF Timberline HDZ roof in Hunter Green, flashed around the skylights, and green metal roofing over the porch and the small awnings. Then the walls: insulation board over the sheathing, CertainTeed cedar shake vinyl siding, and white AZEK trim on every corner, window and door. AZEK is a cellular PVC trim, so it does not rot and does not need paint.
The middle photo shows the stage you never see once the siding is on: the insulation board going onto the dormer. It adds insulation value to the wall and gives the shakes a flat, even surface to sit on, which is why the finished walls read straight from the road and from the water.
WHAT WE DO
What Our Siding Jobs Include
Every siding job starts with a free on-site estimate and a written proposal that spells out the material, the trim, the flashing work and how any rot under the old siding will be handled.
Full Siding Replacement
The old siding comes off down to the sheathing, or stays in place under a new layer of insulation board or housewrap, and which one is decided at the estimate by the condition of the wall and written into the proposal, not by what is quicker on the day. On a tear-off we replace soft sheathing before anything new goes up. Either way the wall gets wrapped or boarded, every opening gets flashed, every roof-to-wall joint gets checked or redone, and the new siding goes up to the manufacturer’s spacing and clearances. The existing gutters come down and are replaced with new ones. New trim, corner posts and starter strips go in with the new siding, and the proposal names the material, the profile and the color before the dumpster arrives.
Siding and Roof Together
When the roof and the siding are both due, we do them as one planned project, roof first. New step flashing, kick-out flashing and drip edge go in with the roof, and the housewrap and siding lap over them in the right order. One crew, one schedule, one set of flashing details, and no seam between two contractors for water to find. Our residential roofing page covers the roofing half.
Soffit, Fascia and Trim
The soffit under the eave vents the attic, and the fascia behind the gutter carries the gutter’s weight. Both are usually the first wood on a house to rot, since they sit where roof water lands. We replace soffit, fascia and trim as part of the siding job, so they go in with the siding and the colors and the venting match. Because the gutters come down on every re-side anyway, the fascia gets looked at bare, and anything soft is replaced before the new gutters go up.
Insulation Board Under New Siding
Before the new siding goes up, we fasten rigid foam insulation board over the sheathing, or over old siding that is staying in place. Old Bergen County walls are rarely flat. Plank sheathing has shifted, old shingles have cupped, and siding hung straight onto that follows every bump. The board gives the new siding one even plane to sit on, so the courses run straight and the panels do not ripple. It also puts a continuous layer between the framing and the weather, which takes some of the chill off the inside walls in winter and cuts down on drafts at the outlets and trim.
HOW WE DECIDE
Tear-Off or Side Over: How We Decide
A full tear-off is the right call when there is any reason to doubt what is behind the old siding. Sheathing that feels soft when you press on it. Stains, bubbling paint or a musty smell inside, especially under windows and below where a roof meets the wall. Old aluminum or vinyl that has gone wavy or holds moisture against the wall. And any time the owner wants the wall opened and looked at before it is closed up again. Tearing off is how you find out what the wall is made of and fix it before new siding hides it. It is the only way to replace sheathing, wrap the wall from bare and flash every window from the sill up.
Siding over makes sense when the old siding is flat, dry and well fastened, with no soft spots and no history of leaks, and the owner understands the sheathing will not be inspected. The other case is asbestos-cement shingle. Those shingles are stable as long as they are not broken up, and removing them is abatement work we do not do, so they stay in place and get covered. Either way, what stays on the wall gets a new layer before the siding goes up, housewrap or rigid insulation board, with the seams taped and the openings flashed to the new surface. The gutters come down and are replaced regardless. The call is made at the estimate, with the reasons written into the proposal.
QUESTIONS WE GET
Siding Questions from Bergen County Homeowners
We do new siding installation and full replacement only, not repairs. If you have one cracked panel or a single rotted trim board on an otherwise sound wall, a handyman or the company that installed the siding is the right call, and the original installer may still have matching stock. Faded vinyl is hard to color match with a new panel, so even a good repair tends to show. Cupping or loose panels across a whole elevation, soft spots under windows, or stains inside point to a problem behind the siding that a patch does not reach. That is when replacement makes sense, and when we can help.
Sometimes. If the old siding is flat, dry and well fastened, and there is no sign of leaks or soft sheathing, new siding can go over it on a layer of insulation board or housewrap, and with board the wall is flatter for it. If anything is soft, stained or wavy, or you want to see the sheathing, the old siding comes off. Asbestos-cement shingle is the one case where we always side over, because removing it is abatement work we do not do, and the shingles are stable as long as they are not torn off. We make the call at the estimate and write the reasons into the proposal, so if another bid you are holding says side over without saying why, that is the first thing to ask about.
Roof first, in almost every case. The step flashing and kick-out flashing where the roof meets the wall go in with the roof, and the housewrap and siding need to lap over them. Doing the roof second means cutting into finished siding to get the flashing right, or skipping it. Roof tear-off debris also lands on the walls. If the roof has years left, we tie into the existing flashing. Windows, if they are due, also go in before the siding.
It gets replaced before anything new goes on. Nobody can see through siding, so the proposal states in advance how sheathing replacement and any framing repair will be handled and how you will be told. You are shown the damage, you approve the work, and it is written up as a change to the contract. Covered-up rot is the hidden problem that turns up again and again on walls that were sided over without anyone checking first, which is why, apart from asbestos-cement shingle, we only side over a wall with no soft spots, no stains inside and no history of leaks.
Yes, with adjustments. Vinyl gets brittle in the cold and cracks if it is cut or bent carelessly, so the crew works slower and leaves wider expansion gaps, because panels hung in January grow in July. Fiber cement and wood can be hung in the cold, but caulk, stain and paint have temperature limits, so finishing may wait for a warmer stretch.
A whole-house re-side usually runs one to two weeks on site once the material is in hand, and tear-off is the noisy part. Hidden rot, weather and the amount of trim all stretch that. Whether your job needs a permit or a notice depends on what is being done, so check with your town’s construction office, or ask us to, before work starts. Expect a dumpster in the driveway and vibration through the walls while the old siding comes off.
Two kinds of warranty come with new siding. The manufacturer covers the product, with terms that differ by material and are often prorated. We back our own work with a 20-year workmanship warranty on the siding we install. It holds as long as you keep up normal maintenance, such as paint and caulk on wood and fiber cement and keeping the siding clean. New Jersey’s home improvement rules require a written contract for a job like this, and ours shows our HIC registration number, the scope and materials, the start and completion dates, the price and any warranty terms. Before you sign any siding contract, make sure it lists the material and color, the trim, whether insulation board goes on, that the gutters are being replaced, and who pulls the permit.
FREE ON-SITE ESTIMATE
Get a Siding Proposal Built From the Wall Out
We will walk the house with you, look at the sheathing wherever it is exposed, check every roof-to-wall joint and kick-out, and look behind the gutters at the fascia. Then you get a written proposal, with any roofing work quoted separately. Financing is available for siding, provided by Wisetack and subject to credit approval. No pressure on the visit, and no number until we have seen the wall.